1080免费观看超清 亚洲精品久久久久69影院 -中文字幕精品视频在线观-伊人丁香狠狠色综合久久-真实国产乱子伦对白视频37p-2020国产精品视频免费-720手机在线看 亚洲国产欧美日韩欧美特级--精品人妻伦九区久久aaa片-国精品人妻无码一区二区三区喝尿,国产一区二区三区小向美奈子,无套内谢小罗莉在线播放,女人与公拘交酡过程高清视频

NEWS
Installation of stainless steel metering pump and points for attention
Time:2019-01-22 01:43:05 Browse:3520

The stainless steel metering pump is placed in the preheating furnace, and the preheating temperature is set according to the spinning process temperature. Generally, the preheating temperature is slightly higher than the spinning process temperature of 10. Preheating time, according to pump type, specifications, specifications and other requirements, is generally set at 8 to 24 hours.

From preheating to setting temperature, keep warm and wait for installation. Before loading, the stainless steel metering pump from the preheater needs to be flexible and then removed by hand plate inspection. If stuck, loosen the top cover screw review: blocking re-supervision disappeared, fastening nuts; blocking phenomenon did not disappear, need to check decomposition; after review, the installation of the pump should be stuck.

When installing the stainless steel metering pump, according to the torque required by the operation instructions of the pump, the torque wrench should be tightened evenly, that is to say, manual board check whether the rotation is flexible, if too tight, blockage phenomenon can loosen the fixed screw check: disappear tightness, blockage phenomenon, indicating that the connecting surface of the aircraft is bad, need to be further checked; blockage phenomenon has not disappeared, need to check the pump. Check, there is a card pump, not installed.

Note: Before installation, the connecting surface should carefully clean the stainless steel metering pump and pump plate to ensure no impurities; the fastening screw must use high temperature sintering oil; the temperature balance can be added to the fastening torque; the fastening must refer to the manual of the stainless steel metering pump. Too small, may lead to joint leakage; too large, will lead to pump failure.

CONTACT
Join:All the products of our company are for the whole country to recruit agents. If you want to join in business and order, please contact us by the following ways.
13771177635Mr. Liu
13921516709Mr. Zhao
Email
sales@yuanshuflow.com
Room 201-1, Famous Creative Intelligence Park,
501 Nanhu Avenue, Liangxi District, Wuxi City

Focus on Wechat Public Number

Focus on Mobile Official Website
Copyright © 2019 Wuxi YuanShu Intelligent Fluid Technology Co., Ltd. All Rights Reserved   備案號:蘇ICP備19004024號